
Add to Cart
PVC Foam Board Extrusion Machine Max Width 1220 / Wpc Board Making Machine 400kg/H
PVC Foam Board Extrusion Machine Production Line Composition
Auto Loader - Conic twin screw extruder HYZS80/156 - Mold - Calibrating machine - Cooling conveyor - Roller traction - Vertical cutter - Horizontal cutter - Stacker
PVC Foam Board Extrusion Machine HYPET Unique Advantages
New generation gear box to put bearings near to the screws not in the far back;
HYPET Extruder + die device to make the product more hard & bright;
HYPET barrel in two parts bi-matal, and totally hard alloy ensure more than 3 years; (less than 75% CaCo3)
Electric cabinet can be separated; Electrical cabinet and mechanical detachable, as Cincinnati structure;
HYPET made own PLC control program to meet intelligent requirement;Electromagnetic induction heater to save energy.Adopt Germany technology, it can achieve the highest output of China equipment;
PVC Foam Board Extrusion Machine Configuration list
Note: This table as attached file which is for selection of the configuration on the whole line
SN | Items | Choosing configuration | Other option |
1 | Production control system | PLC control system | Digital is for option |
2 | Cooling system of the main control electric cabinet | Fan cooling for option | Air conditioner cooling cabinet |
3 | Main motor | AC motor with famous inverter | DC is for option |
4 | Pressure sensor | HYPET individual temperature and pressure control in two parts | Dynisco is for option |
5 | Core thermoregulation control | Internal closed loop heat balancing system. | External heat control option |
6 | Material of screw & barrel type | Nitro Alloy with bi-metal in two parts | Standard Nitro with Alloy plating option |
7 | Quantitative feeding system’s mixing function | Standard dosing device in single screw type. | Twin screw with Mixing device option |
PVC Foam Board Extrusion Machine Condition of use
1. PVC Foam Board Extrusion Machine Technical features of whole line
SN | Specification | Description | Remark |
1 | Suitable material | PVC mixed powder | |
2 | Product size | Width: 1,220mm, thickness: 5~20mm | |
3 | Max. output | 350-400kg/h | |
4 | Test and accept | Based on HYPET standard formula. | |
5 | Center height | 1,100mm | |
6 | Whole line size (L x W x H) | 22,000 x 2,100 x 2,200mm | |
7 | Operation direction | From right to left | |
8 | Color of equipment | HYPET white color | |
9 | Control of whole production | Refer to the “configuration list”. | |
Note | Extrusion capacity will be changed according the processing material and working conditions |
2. PVC Foam Board Extrusion Machine Circumstances condition
SN | Condition | Specification | Description |
1 | Natural circumstance condition | Working place | Indoor use |
Power source | No dangerous area | ||
Humidity | 55%~85% no condensation | ||
Temperature | 0~40 ℃ | ||
2 | Electricity source | Installation capacity | 200 kW |
Actual consumption | 160 kW | ||
Power supply | 3P+N+PE | ||
Voltage/Frequency | 380V/50Hz other can be option | ||
3 | Cooling water | Temperature | ≤15 ℃ |
Water pressure | ≥0.3MPa | ||
Flow | ~15 m3/h | ||
4 | Air condition | Compressor air pressure | ≥0.6MPa |
Flow | ~0.9 m3/min |
PVC Foam Board Extrusion Machine Terms & conditions
1. Training and services
1) Instruction of field installation.
2) Equipment field debugging and trial run if required by the buyer according to the rule.
3) Training on field operation and maintenance for customer's personnel.
4) Provide technical consultation service on long-term basis.
2. Installation and debugging
When the machine arrives at site, the customer should install it on the appropriate position according to the specifications provided by the supplier; and then the supplier should send its engineers to the site if requirement approved,in order to instruct the customer about trial run and debugging. The customer should provide necessary conditions for trial run and provide materials for trial run, and should decide the processing conditions in trial run with consideration of the supplier's opinions.
1) The price covers the pre-commissioning of the machinery before shipment at Seller's site. The Seller is obliged to test the performance of machinery.
2) The Buyer is obliged to provide suitable space, tools and manpower for the commissioning of the order.
3) This Price does not included commission and installation in buyer’s factory.
3. Pricing
1) The above mentioned quotation is valid within 30 days counted from the issue date of quotation.
2) The price and machinery configuration should be updated and confirmed by the Seller in the case that the quotation has been beyond the validity period.
3) The above mentioned quotation is based on Ex works. Sea transportation and wooden case packing is excluded.
4) The price does not cover the cost of testing material. The testing material will be supplied by the Buyer. Or the Seller will purchase the material as requested by the Buyer at Buyer's cost.
5) The price does not include the cost of commissioning at Buyer's site.
The Seller reserves the right to modify the specification and design of the machine in order to enhance the product quality.
4. Terms of payment
1) T/T and L/C (irrevocable, at sight) both are acceptable.
2) 35% of the total contract value should be paid in advance, balance 65% of the total value is to be paid before shipping at the Seller’s factory.
5. Time of delivery
1) When the contract becomes valid, the machine should be delivered within 45 days since receipt of the advance payment. And the equipment will be in normal operation after debugging within two weeks after arrival.
2) During production, provided that the Buyer requests to modify the specification of the order, the Buyer shall notify the Seller of this modification in written form. Upon receipt of the notice, the Seller will quote to the Buyer the cost of this modification and notify the Buyer of any possible delay due to this modification.
6. Debugging charge
The buyer pays for the plane ticket of round-trip abroad and food and accommodation of buyer’s country during debugging. And the wage of technicians should be paid by the customer (80USD/day).
7. Guarantee clause
1) Guarantee is 1 year (excluding human factor and wearing parts).
2) Under proper working conditions, 12 months from the date of completion of commissioning at the buyer's site, and should be at the latest within 14 months from the issuing date of Bill of Lading.