630 Big PVC Pipe Producdtion Line With Twin Conic Extruder ZS95/192
630 Big PVC Pipe Producdtion Line Whole production line composition:
630 Big PVC Pipe Producdtion Line Auxiliary machine for option:
630 Big PVC Pipe Producdtion Line HYPET unique advantages Except the same features with other supplier.
630 Big PVC Pipe Producdtion Line Configuration list
Note: This table as attached file, which is for selection of the configuration on the whole line
SN | Items | Choosing configuration |
1 | Production control system | PLC control system |
2 | Cooling system of the main control electric cabinet | Fan cooling electric cabinet |
3 | Main motor | AC motor with famous inverter |
4 | Pressure sensor | HYPET individual temperature and pressure control in two parts |
5 | Core thermoregulation control | Internal closed loop heat balancing system. |
6 | Material of screw & barrel type | Nitro Alloy with bi-metal in two parts |
7 | Quantitative feeding system’s mixing function | Twin screw with mixing device option |
8 | Pipe calibrator sleeve | Copper calibrator sleeve |
9 | Cutter | Dustless type in new technology |
630 Big PVC Pipe Producdtion Line Condition of use
1. 630 Big PVC Pipe Producdtion Line Technical features of whole line
SN | Specification | Description |
1 | Suitable material | PVC powder |
2 | Pipe diameter range | Ø315-Ø630mm |
3 | Production speed | 0.15 ~ 1.5 m/min |
4 | Max. output | 800kg/h |
5 | Test and accept | Based on HYPET standard formula. |
6 | Center height | 1,000mm |
7 | Whole line size (L x W x H) | 27,000 x 1,200 x 2,450mm |
8 | Operation direction | From right to left |
9 | Color of equipment | HYPET white color |
10 | Control of whole production | Refer to the “configuration list”. |
Note | Extrusion capacity will be changed according the processing material and working conditions |
2. 630 Big PVC Pipe Producdtion Line Circumstances condition
SN | Condition | Specification | Description |
1 | Natural circumstance condition | Working place | Indoor use |
Power source | No dangerous area | ||
Humidity | 55%~85% no condensation | ||
Temperature | 0~40 ℃ | ||
2 | Electricity source | Installation capacity | 300kW |
Actual power consumption | 200kW | ||
Power supply | 3P+N+PE | ||
Voltage/Frequency | 380V/50Hz, others can be optional | ||
3 | Cooling water | Temperature | ≤15 ℃ |
Water pressure | ≥0.3MPa | ||
Flow | ~15 m3/h | ||
4 | Air condition | Compressor air pressure | ≥0.6MPa |
Flow | ~0.9 m3/min |
630 Big PVC Pipe Producdtion Line
630 Big PVC Pipe Producdtion Line Terms & conditions
1. 630 Big PVC Pipe Producdtion Line Training and services
1) Instruction of field installation
2) Equipment field debugging and trial run if required by the buyer according to the rule.
3) Training on field operation and maintenance for customer's personnel.
4) Provide technical consultation service on long-term basis.
2. 630 Big PVC Pipe Producdtion Line Terms of payment
1) T/T and L/C (irrevocable, at sight) both are acceptable.
2) 30% of the total contract value should be paid in advance, balance 70% of the total value is to be paid before shipping at the Seller’s factory.
3. 630 Big PVC Pipe Producdtion Line Time of delivery
1) When the contract becomes valid, the machine should be delivered within 60 days since receipt of the advance payment. And the equipment will be in normal operation after debugging within two weeks after arrival.
2) During production, provided that the Buyer requests to modify the specification of the order, the Buyer shall notify the Seller of this modification in written form. Upon receipt of the notice, the Seller will quote to the Buyer the cost of this modification and notify the Buyer of any possible delay due to this modification.
4. 630 Big PVC Pipe Producdtion Line Debugging charge
The buyer pays for the plane ticket of round-trip abroad and food and accommodation of buyer’s country during debugging. And the wage of technicians should be paid by the customer (80USD/day).
5. 630 Big PVC Pipe Producdtion Line Guarantee clause
Under proper working conditions, 12 months from the date of completion of commissioning at the buyer's site, and should be at the latest within 14 months from the issuing date of Bill of Lading.